BY ANDREAS STÖCKL
Warehouse systems and machine control go a long way. But in automated warehouses where store deliveries and e-commerce are handled within the same facility or network, there’s a gap between plan and reality. That’s where a WES makes a difference.
It’s 10:00 a.m. at a modern distribution center. Restocking for about a hundred stores needs to be completed before lunch, while an e-commerce campaign has kicked off earlier than expected. The orders are in the system, the robots are ready, and the staff is on site. Yet lines are forming at some picking stations while others stand idle. This is rarely due to a lack of systems. In many warehouse setups, there is no layer tasked with coordinating priorities, resources, and material flows in real time as conditions change throughout the day.
Three systems with different functions
The warehouse management system (WMS) knows what needs to be done: which orders are pending, where the goods are located, and what needs to be shipped. The warehouse control system (WCS) ensures that robots and conveyors move as they should. Both handle some of the dynamics on their own. But in a warehouse with multiple parallel flows, something is also needed to determine when and where the work should be performed. That’s a WES—a real-time execution system. A WES does not replace the other systems but acts as a coordinating layer between them. It distributes work among stations, robots, and employees, removes tasks from queues, and reprioritizes when conditions change. The need is growing. Order flows are becoming harder to predict, delivery times are getting shorter, and more and more businesses are managing both brick-and-mortar stores and e-commerce within the same facility or network. A plan made in the morning rarely holds up for the entire day. It is in the gap between plan and reality that capacity is gained or lost.
This is how quickly a warehouse network can learn
Decathlon’s Skyfleet program is a clear example. Seven European distribution centers have been built according to a common design and with a standardized interface to the warehouse management system. Depending on the facility, the systems are designed to handle approximately 150 to 200 robots and 3,000 to 4,000 order lines per hour. The biggest benefit is how quickly knowledge spreads. The facility in Setúbal, Portugal, was fully operational after five weeks and now serves 73 stores, up from 41 previously. An improvement developed at one warehouse can be implemented at all seven within a month. In Ferrières-en-Brie, France, 13 new robots were commissioned during the year without interrupting operations. The same trend is evident in Sweden. Stadium’s new logistics center in Norrköping will be Exotec’s first Swedish installation—an investment of 300 million kronor featuring more than 240 robots. It is scheduled to begin operations in 2028.
Four Questions to Ask Before Your Next Automation Project
- How are reprioritizations handled when the order status changes during the day?
- What is required to connect new equipment without interrupting operations?
- Which interfaces, processes, and experiences can be reused in the next layer?
- Who owns the control logic: you, the supplier, or the integrator?
Robots are what you see in an automated warehouse. But it’s the ability to make the right decisions at the right moment that determines whether the investment pays off.
—