As Intersport builds a new central warehouse on its own, it is investing in an AutoStore system as the hub of its logistics solution. Together with Element Logic, a comprehensive solution has been developed, focusing on both current workflows and future growth..
The new automated warehouse operations are being set up in a dedicated facility in Nässjö, with the goal of ensuring control, scalability, and competitiveness. At the heart of this initiative is an AutoStore system, a new WMS, and Element Logic as the integrator.
“Our previous AutoStore solution has provided us with valuable experience, and we look forward to continuing to grow together with Element Logic. With the new warehouse, we’re taking our logistics to the next level—both in terms of capacity and technical capabilities,” says Joakim Nielsen, Warehouse Manager at Intersport.
Working closely with Intersport, Element Logic’s specialists have analyzed data, simulated capacity, and designed a solution that is fully tailored to the new facility’s requirements. This means, among other things, that the AutoStore solution is located directly adjacent to the inbound and outbound gates, resulting in a smoother flow than in the previous warehouse. The AutoStore system itself is powerful, but its true value lies in the overall solution, where Element Logic has played an active role in helping Intersport integrate the Router and eLogiq software, which, among other things, help reduce the need for manual handling. As a WMS provider, with Element Logic serving as a consultant, Intersport has chosen NYCE.
– We draw on our experience from previous migration projects. Here, we’ve been able to plan for both current operations and future needs—and help the customer make the right decisions regarding both software and layout. It’s a holistic approach with a focus on Customer Success,” says Ertugrul Kilicaslan, Account Manager at Element Logic Sweden.
The Autostore system consists of 50,000 bins, 44 R5 robots, and a grid with a capacity of 61,377. Commissioning is scheduled to begin in the fourth quarter of 2025.






